Skip to main content

Exhibit Installation

Trade Show Booth Installation Services

Efficient and High Quality Trade Show Booth Installations

Ensure your trade show booth is set up for success with ASTOUND’s Trade Show Booth Installation Services. Our team of experienced professionals provides efficient and high-quality installation services that streamline the setup process and minimize hassle. Whether you're dealing with complex structures or need precision in display arrangements, ASTOUND ensures that your booth installation is handled flawlessly, allowing you to focus on your presentation and client engagement.

From small-scale setups to large, elaborate exhibits, our installation solutions are designed to meet the specific needs of each client, ensuring that every aspect of your booth is perfectly executed to make your trade show experience as effective and stress-free as possible.

See the work

Selected work



Astec Industries
ConExpo Show

Located right at some of the hall entrances, the Astec brand dominated the conventional hall from the moment attendees entered.



Boston Dynamics
MODEX

Boston Dynamics wanted to use the trade show experience at MODEX, to create brand and product awareness for their latest mobile robot.

Frequently Asked Questions

What is the average size of a trade show booth?

The average size of a trade show booth typically ranges from 10x10 feet (100 square feet) to 20x20 feet (400 square feet), which are standard sizes offered by many trade show venues. However, booth sizes can vary significantly based on the type of show, the venue, and the exhibitor's budget and needs. Larger booths, such as island exhibits, may be 20x40 feet or larger, providing ample space for more elaborate designs and visitor interactions.

How long does it take to build a trade show booth?

The time it takes to build a trade show booth can vary widely depending on the complexity and size of the booth. For standard modular booths, setup might take a few hours to a full day. Custom booths with intricate designs and multiple components can take several days to construct. Preparation often begins months in advance with design and fabrication, but the onsite build typically starts a few days before the trade show opens to ensure everything is ready for the event. Coordination with the installation team is crucial to align the build schedule with the event timeline and venue regulations.